Skip to main content

Posts

New Driving Range Net

Last week our staff removed the existing fence between the tee on #17 and the driving range.  It was quite tedious as we had to pull it down, disassemble it, and cut it up for removal. The new net was installed by a company last Friday.  It looks great, and blends into the natural surroundings extremely well.

Early Start on Tree Pruning

The weather this week was not conducive to leaf clean-up, so we got an early start on tree pruning.

Winter Preparations

Cold, wet weather has created challenging working conditions as we conduct our winter preparations on the golf course.  Despite the poor weather, we have been able to make our final fungicide applications of the season on greens, tees, and fairways.  Tee markers, bunker rakes, and coolers have been removed from the course.  We have winterized the bathrooms and irrigation system. winterizing the irrigation system We were also able to mulch a significant amount of leaves this past week. mulching leaves on #14 This morning, we woke up to a couple of inches of snow on the ground.  It looks like this week's tasks will have their own set of new challenges. much mulching remains to be completed

Cart Path Work

It was another productive week; we improved a few of our existing cart paths.  The paths on #3 green/#4 tee, #6 green/#7 tee, and #17 green/#18 tee were all resurfaced with cart path material.  The paths were shortened to better suit the flow of traffic.  In addition, unnecessary sections of the paths were eliminated. #3 green / #4 tee #6 green / #7 tee Additionally, a company was in this week preparing specific paths for new asphalt.  Weather permitting, #12 green, #14 tee and #14 green will be getting fresh asphalt over the next 7-10 days.

Drainage

Because the leaves fell at a slower rate this week, we focused much of our attention on a few drainage projects. On #4, we added additional drainage to the approach and south rough. On #6, we added additional drainage just west of the right green side bunker. On #7, we added additional drainage south of the creek between #7 and #10. #4 before drainage #4 after drainage