It was another productive week; we improved a few of our existing cart paths. The paths on #3 green/#4 tee, #6 green/#7 tee, and #17 green/#18 tee were all resurfaced with cart path material. The paths were shortened to better suit the flow of traffic. In addition, unnecessary sections of the paths were eliminated.
 |
#3 green / #4 tee |
 |
#6 green / #7 tee |
Additionally, a company was in this week preparing specific paths for new asphalt. Weather permitting, #12 green, #14 tee and #14 green will be getting fresh asphalt over the next 7-10 days.