Because the leaves fell at a slower rate this week, we focused much of our attention on a few drainage projects.
On #4, we added additional drainage to the approach and south rough.
On #6, we added additional drainage just west of the right green side bunker.
On #7, we added additional drainage south of the creek between #7 and #10.
On #4, we added additional drainage to the approach and south rough.
On #6, we added additional drainage just west of the right green side bunker.
On #7, we added additional drainage south of the creek between #7 and #10.
#4 before drainage |
#4 after drainage |