Greens aerification was finished last night ahead of schedule. Perfect weather (sun, wind, and low humidity) allowed us to work the sand in much more efficiently than anticipated. A huge thanks to the staff for their tremendous effort.
sand application to #18 green |
sand drying on #9 green |
aerifying #5 green |
aerifying #14 green |
rolling #18 green |
changing cup on #15 green |
finished product on #6 green |