Greens aerification was finished last night ahead of schedule. Perfect weather (sun, wind, and low humidity) allowed us to work the sand in much more efficiently than anticipated. A huge thanks to the staff for their tremendous effort.
| sand application to #18 green |
| sand drying on #9 green |
| aerifying #5 green |
| aerifying #14 green |
| rolling #18 green |
| changing cup on #15 green |
| finished product on #6 green |