Skip to main content

Interesting Aerification Observations

Every time the soil reliver is called into action, I marvel at the engineering involved in its conception.  This piece of equipment takes a tremendous amount of abuse as its sole job is to hammer the ground and fracture the soil structure.


It also does a nice job of finding rocks.  The picture below is a rock unearthed from 7 fairway.

Below is a picture of two aerification tines.  The one on the left is a brand new 14" long tine, the one on the right is a  9" used tine after 13 hours of aerification.


Fairways 1-10 & 18 were aerified this week, which is...

...644,071 square feet of fairways (62% of our total fairway square footage).

...2,576,284 aerification holes.