It has been another productive week.  The leaves continue to change color, and are now falling at fairly consistent rate.  This has kept us busy blowing and mulching leaves, but we were able to squeeze in several projects, as well.

blowing #18 fairway

blowing #5 green

We spent some time this week redesigning and adding some new perennial plants to the ornamental beds on #2, #4, and #10.  

redesigning bed on #10 tee

 bed on #10 will have a fresh burst of color next year

We also extended the brick paver path on #10 tee to give us a little more room to direct traffic off of the path.

Mike installing the new path

looks great and will help with traffic control

Most of our time this week was spent leveling and expanding #15 tee. Over the years, the back third of the tee had become uneven.  This project included striping the sod, removing 4" of soil that had created a hump in the middle, and relaying the sod.  We also expanded the tee on the north and east sides to create more teeing space.

old sod stripped on #15 tee 

removing excess soil 

relaying the sod 