Over an inch of rain and hot humid conditions this weekend has caused a surge in the growth of the rough. As a result, we are postponing the construction of the forward tees scheduled this week to focus on mowing. With the short week due to the holiday, all of our available personnel will be mowing to get the rough back in shape.
José and Rich cutting the rough on #3 |