Today we worked on the finish grade and leveled irrigation heads on the driving range tee. Tomorrow we will put the finishing touches on the tee before the seed and sod work begins Thursday.
On the course, fairways 6 & 7 and the short range were aerified today, bringing fairway core aerification to a close.
getting closer to the finish grade |
irrigation head being installed |
On the course, fairways 6 & 7 and the short range were aerified today, bringing fairway core aerification to a close.
this is what 2.4 million cores looks like on #7 fairway |