Skip to main content

Posts

Still Saturated

We picked up another .25" of rain last night bringing our rain total to over 3" over the last five days.  Today's agenda included pumping down the largest areas of standing water in #3 fairway, #5 fairway and in front of #8 tee.  We pumped over 140,000 gallons of water from these areas. #8 tee #3 fairway #5 fairway We were able to repair the washouts on all 55 bunkers on the course.  A big thanks to the staff for a great job on this tedious task. early start on #9 #18 completed bunker on #17

Heavy Rains and Wet Conditions

The golf course remains extremely saturated after heavy thunderstorms passed through our area.  The storms began about 3:00 AM this morning and have continued throughout the day.  We continue to pump as much surface water off as possible.  However, it has been difficult to keep up as the rain has not stopped.  We have accumulated over 2" of rain so far. #1 fairway and rough #8 #9 rough between #9 and #18  #11 #13 #18  We will continue to pump off excess surface water and repair the bunkers tomorrow.

August Update

Greens were aerified Monday and Tuesday of this week.  Although the weather was warmer than we would have wished for, it did help dry out the sand and we were able to fill the 3.6 million holes we created.  With the warm night time temperatures, the greens are healing beautifully.  We will continue to roll them to smooth them out.  I would anticipate mowing greens early next week when there is less of a chance to pick up the sand with the mowers. #8 green #8 green The other project we have been working on is edging and adding cart path material to our existing paths.  Paths around #3 green, #5 green, #7 tee, #8 tee, #7 tee and #17 green have all been refreshed with new material.

Summer Update

Despite the hectic spring, we are finding a better rhythm as we move into summer.  I have been pleased with the consistency and playability of the course.  We continue to tweak our maintenance practices to provide the best golf course we can, given the environmental conditions that day. It has been a productive last couple of weeks, as numerous projects have been completed.  This week's projects included: verticutting and topdressing greens. verticutting #4 green topdressing #6 green brushing in sand #2 green We also rerouted and added new cart path material to the cart path on #6 tee. new cart path on #6 tee The landscape beds on #2 tee, #4 tee, and #12 tee were renovated last week. #2 tee bed #4 tee bed #12 tee bed

March Update

The moderate temperatures this week melted the majority of snow on the course.  I was able to walk around and was pleased with how the turf has endured the winter.  Everything looks to be in good shape as we head into spring.  Ground conditions still remain soft.  #14 green is the only green still snow covered. #14 green